Plant switches to reconnected 330-kV backup line after four months

The plant then switched to the only available backup line, which was recently reconnected after four months of being inactive. The 330-kilovolt backup power line was cut on March 1 due to damage on the opposite bank of the Dnipro River.

→ View original post on X — @kyivindependent

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *