The 330-kilovolt backup line, connecting the Zaporizhzhia Nuclear Power Plant (ZNPP) to the Ukrainian grid via the thermal power plant's distribution point in Enerhodar, was restored on September 10. This enabled ZNPP to shut down the last operating reactor ahead of schedule on the night of September 11.

Leave a Reply