An additional well is also planned to be drilled at ZNPP, which will provide approximately 250 cubic meters of water per hour to maintain cooling of the reactors and spent fuel pools in the current shutdown state.
An additional well is also planned to be drilled at ZNPP, which will provide approximately 250 cubic meters of water per hour to maintain cooling of the reactors and spent fuel pools in the current shutdown state.
Leave a Reply